Dual Feed AC400V 22KW Rack Type Load Bank For Data Center Server Simulation

×

JUNXY Rack Mounted Load Bank

Following on from construction and testing, Data Centre Commissioning is essential to ensure that the completed facility is configured for maximum efficiency. Missing out the essential Data Centre Commissioning can lead to an inefficient facility and higher than expected operational costs. By simply identifying where equipment manufacturers’ standard specifications are not appropriate for the IT load, the supporting infrastructure, in particular the cooling plant, can be configured to meet the requirements of the facility and lead to much higher levels of efficiency. Data centre commissioning can lead to significant energy savings when implemented correctly by a specialist commissioning team. By engaging JUNXY power solutions to ensure that systems are running correctly, clients have saved up to 67% on facility operational costs.

The Junxy rack mounted AC & DC load banks are designed especially for internet data center (IDC) test and commissioning. Load bank integrated system test (IST) could precisely simulate the data center’s electricity consumption, heat dissipation, air flow, hot & cold aisle testing, thus to ensure the effective operation of power supply & distribution system (generator, UPS, EPS included), air conditioning system, lightning protection and earthing system, monitoring system, data center integrated environments, cabinet IT environment, providing independent verification of integrated system testing. Successful IST(integrated system test) should have installation of server load banks in data center and server room etc, Junxy provides resistive, reactive and capacitive load banks in low or medium voltage to cover the entire scope of your commission and testing requirements.

Applications
  • Data center & server room cooling system test
  • Data center air flow, hot/cold aisle environment inspection
  • Validating the tire level of data center
  • Validating the reliability of data center power supply & distribution system
  • Testing the main network before connecting user devices (servers, switches, etc.)

JUNXY AC400V 22KW dual feeds/power rack load bank

The JUNXY AC400V 22KW dual feeds/power rack load bank is a safe and simple way to provide rack level load testing.

The small 8U footprint can test up to a maximum of 22KW of load, controlled via 4 5.5KW individually controlled load segments by the mini circuit breaker.

It is auto transfer in between the 2 feeds/power, with lights indicator power on for each feed/power. Each feed with 4 load steps 5.5KW by IEC 5pins connector.

Light weight and portable with 2 front handles & 1 rear handle. Connection to the load bank is made effortlessly via 2 set 5m long IEC input sockets, mounted conveniently on the front of the unit. Cool air intake at front, hot air exhaust at rear. Over heat protection with load removed automatically.

JUNXY-AC400V-22KW-LB-cable-Copy-scaled.jpg
AC400V-22KW-DUAL-FEEDS-01-JUNXY-scaled.jpg