AC400V 30KW Grid Connected Inverter Anti-Islanding RLC Load Bank Test System

×

Why need load bank testing

It is really critical that your standby power system say UPS(uninterrupted power supply), battery bank, generator, transformers, inverter etc working in good condition if switched to be loaded when the main power supply in maintenance procedure or stop abnormally. Downtime could be reduced by regular maintenance and thorough inspections which are the key to power supply systems maintenance.

Critical power backup equipment like UPS System and generator which especially located in harsh, dusty or corrosive environment will fail without proper preventative maintenance. JUNXY provides a whole range of custom preventative maintenance products solutions for UPS systems and generators and many more to ensure constant uptime for your power systems and make you prepared for anything.

Load banks help highlight a large range of faults on the equipment it tests. The first objective when testing with an electric bank is to ensure your equipment’s power supply is reliable. The underlying question that needs answering is whether your equipment will have sufficient power supply to ensure uninterrupted operational performance. The load bank also tests that the equipment is not faulty, that there are no faults in construction, that the aging of the equipment is in line with expectations, that the components are reliable and that there are no pending breakdowns or early signs of wear and tear. The load bank also ensures that the product delivers power conform to its specification.

Resistive & reactive load banks are able mimic motor loads and electromagnetic devices within a power system as well as purely resistive loads by offering the ability to set a specific power factor (pf). Many backup generators and turbines are rated at 0.7, 0.8 or 0.85 power factor and need to be commissioned at nameplate capacity using a combination of resistive and reactive load to fully qualify their operating capability. Using a resistive & reactive load bank enables comprehensive testing from a single unit. JUNXY has an extensive range of resistive & reactive load banks to simulate these types of loads on a power source and the transformers, relays, and switches which will distribute the power throughout your facility.

Inductive & capacitive load banks are reactive only and must be used in combination with a resistive load bank to provide the desired load profile to test a power system. Reactive loads banks can provide either a leading power factor (Capacitive) or lagging power factor (Inductive).

JUNXY series AC load bank testing offers you whole solutions of predictive failure analysis for UPS(uninterrupted power supply), generator, transformers, PV system, inverter etc, to validate the condition and output of such power systems comprehensively, which includes (click to view more):

Technical Specifications

ModelJUNXY-AC400V-30KW-RLC AC Load Bank
Load ElementResistor, inductor and capacitor
Load VoltageAC400V 3P4W & AC230V 1P2W
Rated FrequencyResistors: 50/60Hz

Inductors: 50Hz

Capacitors: 50Hz
3 Phase

Load Power
R=30KW(10KW per phase) @AC400V 3P4W

L=30KVar(10KVar per phase) @AC400V 3P4W

C=30KVar(10KVar per phase) @AC400V 3P4W
Load Steps

Per Phase

@AC230V 1P2W, 50Hz
Resistive load steps per phase: 100W-10KW adjustable

Resistive load steps for phase A/B/C(KW):

100W, 200W*2, 500W, 1KW, 2KW*2, 4KW



Inductive load steps per phase: 100Var-10KVar adjustable

Inductive load steps for phase A/B/C(KVar):

100Var, 200Var*2, 500Var, 1KVar, 2KVar*2, 4KVar



Capacitive load steps per phase: 100Var-5KVar adjustable

Capacitive load steps for phase A/B/C(KVar):

100Var, 200Var*2, 500Var, 1KVar, 2KVar*2, 4KVar
Power FactorLeading and lagging power factor 0-1.0 adjustable
Load AccuracyResistor/capacitor: ±5%, Inductor: ±10%
Digital Metervoltage, current, active power, reactive power, apparent power, power factor, energy, frequency
Mains VoltageAC220V 1phase 2wire, 50Hz
Control Modes1. Local control panel

2. PC remote control
Load Input

Wire Connections
Copper bus bar for wire connections
Insulation ClassF
Protection LevelIP54(outdoor usage)
Protection LevelIP54(outdoor usage)
Fan Noise75dB
Cooling ModeForce-air horizontal cooling, by axial-flow fans.
Work ModeContinuous work
ProtectionsOver voltage/current/temperature alarming and load automatically removed, emergency stop button